When to reorder: turning sales velocity and lead time into an order date

Reorder when the stock you have left will only just cover what you sell while you wait for the next delivery, plus a cushion. In practice that means one comparison per SKU: days of stock left against lead time plus buffer days.

The short answer to when you should reorder

Reorder a SKU when the stock on your shelf will only just cover demand for as long as the next delivery takes to arrive, plus a buffer you choose on purpose.

Two ways to write the same rule:

  • In units. Reorder point = average units sold per day × (lead time in days + buffer in days). When stock on hand touches that number, place the order.
  • In days. Order when days of stock left falls below lead time plus buffer days.

The second version is the one to run your week on, because it is already a date. If a SKU sells 11 a day, your supplier takes 21 days from purchase order to receiving, and you want a 7 day cushion, your reorder point is 11 × 28, which is 308 units. Hold 300 and you have 27 days of cover against a 28 day requirement. You are one day late, today.

That is the arithmetic. The rest of this guide is about making the three inputs honest, because a reorder point built on a wrong lead time is worse than no reorder point at all: it tells you that you are safe right up to the day the shelf empties.

Why a reorder point is really a date

Most merchants first meet this as a threshold: type 20 into a box, get an email when stock goes under 20. That works until two things change, and they always change. Velocity moves, so 20 units is three weeks of cover in February and four days in November. Lead time moves, so 20 units is fine for a local printer and hopeless for a container from overseas.

A reorder point fixes that by being derived rather than typed. It is not a number you like, it is a number your own sales and your own supplier produce. And once it is derived, you can turn it into something better than an alert: a date.

Take days of stock left, subtract lead time, subtract your buffer days, and what remains is how many days you have before the order has to go out.

Order in (days) = days of stock left − lead time days − buffer days

With 300 units selling 8 a day, that is 37 days of cover, minus 21 days of lead time, minus a 7 day buffer, so the order goes out in about nine days. That is a line in your diary instead of a vague worry. It also tells you the thing a threshold never does, which is whether you are early, on time, or already behind.

How to work out the order date for one SKU

  1. Start with the SKUs that carry the revenue

    If you have 800 variants, do not set 800 lead times this afternoon. Sort by units sold or margin contributed, take the top 30, and get those right. The long tail can run on a rougher rule until the top of the list is under control.

  2. Measure sales per day over a window you trust

    Take units sold over the last 7, 14 or 30 days and divide by the number of days. Use units, not revenue, and use the SKU, not the product, because a size or colour variant has its own velocity and its own way of running out.

  3. Measure lead time from order to available, not supplier promise

    Count the days from when you hit send on the purchase order to when the stock was actually sellable. Include payment approval, production, transit, customs, and the day it sat in the back room before anyone counted it in.

  4. Choose a buffer in days, not in units

    Decide how many extra days of cover you want to be wrong by. A week is a reasonable starting point for a reliable supplier, more if deliveries slip or the SKU is a hero product you cannot be out of.

  5. Multiply to get the reorder point

    Reorder point = sales per day × (lead time days + buffer days). Write it next to the SKU. This is the stock level at which an order stops being optional.

  6. Convert to a date, then a quantity

    Days of stock left minus lead time minus buffer gives you the days until the order must go out. Then size the order to cover the lead time plus the period until your next order, less anything already inbound.

  7. Re-run it on a fixed day every week

    Velocity changes, so the date moves. A weekly pass over the list catches SKUs that accelerated, and it is short enough that you will actually keep doing it after the third week.

Choosing a sales velocity window: 7, 14 or 30 days

The window you average over is the single biggest lever on the answer, and there is no universally correct choice. It is a trade between reacting fast and reacting to noise.

7 days

Sharp and twitchy. It catches a SKU that started moving this week, which is exactly when you want to know. It also overreacts to a good Saturday, a discount, or one wholesale order that will not repeat, so it can push you into ordering more than the trend supports.

14 days

The usual compromise. Long enough to absorb one strange day, short enough to notice a real shift within a week or two. For most stores with steady weekly patterns this is a sensible default.

30 days

Calm and conservative. Good for slow, steady sellers where a few units a week is normal and daily noise would be meaningless. Bad during a ramp, because a month of history drags the average down and hides the fact that last week doubled.

A practical approach: run a longer window as your baseline, and check the short window on your best sellers. When the 7 day number is well above the 30 day number, treat the short one as the truth and order against it, because you are on the way up and the average is behind you.

One SKU, three windows, three different answers

Velocity windowSales per dayReorder point (21 day lead, 7 day buffer)Days of stock left at 300 unitsWhat to do
7 days13364 units23 daysAlready past the point, order today
14 days11308 units27 daysJust past the point, order today
30 days8224 units37 daysOrder in about nine days

Getting lead time right, because this is where plans break

Lead time is the input merchants get wrong most often, and the error is almost always in the same direction: too short. The supplier says fourteen days, so fourteen days goes in the sheet. The fourteen days was production time, and it started when they acknowledged the order, three days after you sent it.

Count the whole chain:

  • Your own approval and the day you actually raise the purchase order
  • Supplier acknowledgement and any deposit that has to clear first
  • Production or picking time
  • Transit, including the customs step if it crosses a border
  • Receiving at your end, counting in, and getting the quantity into Shopify

The last one is invisible and often costs two or three days. Stock in a box in the corridor is not stock you can sell.

If your last few orders for a supplier took 19, 24 and 22 days, do not average to 21 and feel clever. Use something close to the slowest realistic case, or keep 21 as lead time and let your buffer absorb the variance. Either is defensible. What is not defensible is using the number on the supplier's website.

Set lead time per SKU, not per store. The same supplier can be two weeks on a stocked item and ten weeks on a custom print run, and one figure across both will have you late on half your catalogue.

Safety stock without a statistics degree

Formal safety stock formulas use the standard deviation of demand and of lead time, multiplied by a service level factor. They are correct, and for a store with a few hundred SKUs and patchy history they are usually more precision than the data can support.

The version that survives contact with a real week is buffer days: decide how many extra days of cover you want, and let it scale with velocity automatically. Because the buffer is multiplied by sales per day, a SKU that speeds up gets a bigger cushion in units without you touching anything.

How to pick the number:

  • Reliable supplier, steady demand, easy to reorder: 5 to 7 days.
  • Variable lead time, or a supplier who has slipped on you: 10 to 14 days.
  • A hero SKU, where being out is the expensive outcome: more, and accept the extra cash tied up as the price of not disappointing your best customers.
  • Slow movers and long tail: less, or none. A buffer on an item selling two a month is just money on a shelf.

Buffer days are a spending decision, not a technical one. Every extra day of cover is cash sitting in stock instead of in the bank, and running out is margin you cannot recover on demand you already had. Merchants who catch the reorder point early tend to avoid the second problem without overpaying for the first.

Once you have hit the point, how much to order

Knowing when does not tell you how many. The order needs to cover demand through the lead time and through the period until your next order goes in, and it needs to credit anything already on the water.

Suggested quantity = sales per day × (lead time days + cover days) + buffer − stock on hand − stock already inbound

With 11 a day, a 21 day lead time, 30 days of cover between orders, a 7 day buffer and 300 units on hand and nothing inbound: 11 × 51 is 561, plus 77 of buffer is 638, less 300 on hand is 338 units. Round to the supplier's case pack of 24 and you order 14 cases, so 336.

Then adjust for the real world:

  • Minimum order quantities. If the MOQ is 500, you are choosing between over-ordering and not ordering. Decide deliberately, and consider stretching the cover period for that supplier instead.
  • Consolidation. If freight is priced per shipment, pull forward SKUs from the same supplier that will hit their point in the next couple of weeks. A slightly early order that shares a container often beats two separate ones.
  • Cash. The right quantity you cannot pay for is the wrong quantity. Cut cover days before you cut safety on your best sellers.
  • Shelf life and seasonality. Never order past the point where the stock stops being sellable.

The cases where the simple rule needs help

New SKUs with no history

There is no velocity to average, so the formula returns zero and the SKU looks safe forever. Borrow a velocity from the closest comparable product for the first few weeks, or set a manual floor, and revisit once real sales exist.

A launch or a promotion

A discount pulls demand forward. The velocity you measure during the promotion is not the velocity that follows it, so do not lock a reorder point to a promotional fortnight without adjusting.

Seasonal peaks

A trailing average is always behind a ramp. Going into a known peak, either shorten the window so it reacts faster, or lift buffer days on the SKUs you know will spike, and place the order earlier than the arithmetic says.

Zero sales and slow movers

A SKU with no sales in the window will never cross a calculated point. That is usually correct and occasionally wrong, for example an item that sells four times a year in batches. Keep a short manual list for those.

Stock that is already at zero

The question is no longer when to order, it is how fast, and whether to keep the SKU. Order, then look at how many days it was out, because that is the part worth fixing.

Multiple locations

Units split across locations can look fine in total while one location is empty. If you fulfil from one place, calculate on that place, not on the store total.

Make it a weekly habit, not a daily worry

Daily checking is how this dies. Nobody opens a spreadsheet of 600 SKUs every morning for long, and the value is not in seeing the numbers, it is in acting before the order date passes.

A weekly rhythm holds up:

  1. Pick a fixed day, ideally one that matches when your suppliers like to receive orders.
  2. Pull the list of SKUs at or under their reorder point, with days of cover and a suggested quantity next to each.
  3. Group by supplier so one review produces one order per supplier.
  4. Sanity check the three or four largest lines by eye, and send.
  5. Note anything that surprised you, because a SKU crossing its point earlier than expected is usually a velocity change worth knowing about.

Build the buffer to fit that cadence. If you only order on Mondays, your effective lead time includes up to six days of waiting for the next Monday, so add those days rather than pretending the order goes out the moment the point is crossed.

A spreadsheet can do all of this, and plenty of good stores run exactly that way. It breaks in two places: someone has to refresh the sales data, and someone has to remember the day. Both are silent failures, and you find out about them from a customer trying to buy something you do not have.

Questions

When should I reorder inventory?

When your days of stock left drops below your supplier lead time plus your buffer days. In units, that is average units sold per day multiplied by lead time plus buffer. A SKU selling 11 a day with a 21 day lead time and a 7 day buffer needs an order placed at 308 units.

Is a low stock threshold the same as a reorder point?

No. A threshold is a number you type in and it stays put. A reorder point is derived from current sales velocity and your lead time, so it rises when a SKU speeds up and falls when it slows. A fixed threshold is either too high most of the year or too low exactly when it matters.

Which velocity window should I use, 7, 14 or 30 days?

14 days is a reasonable default for steady sellers. Use 7 days when a SKU is accelerating or seasonal, because a longer average lags the trend. Use 30 days for slow, stable items where daily variation is noise. Compare the short and long windows on your best sellers and order against the higher number.

What should I do if my supplier lead time varies?

Either use something close to the slowest realistic delivery as your lead time, or keep the typical figure and widen your buffer days to cover the variance. Both work. What does not work is using the supplier's quoted number when your last three deliveries all took longer.

How much safety stock should I hold?

Express it as buffer days rather than units so it scales with velocity. Five to seven days suits a reliable supplier and steady demand, ten to fourteen suits variable lead times, and more is defensible on a hero SKU. Every extra day is cash tied up in stock, so treat it as a spending decision.

How do I set a reorder point for a brand new product?

You cannot calculate one, because there is no sales history to average. Borrow the velocity of the closest comparable SKU for the first few weeks, or set a manual floor, then switch to the calculated point once you have real sales inside your chosen window.

How often should I recalculate reorder points?

Recalculate velocity continuously if you can, and review the resulting list weekly. Lead times need revisiting whenever a supplier changes, a route changes, or a delivery lands noticeably late. Buffer days can sit for a season, then be raised going into a known peak.

Can I do this in a spreadsheet?

Yes, and the maths is simple enough that many stores do. The two weak points are the sales export someone has to refresh and the review day someone has to remember, and both fail quietly. That is the gap a reorder report on a schedule is meant to close.